How to request an installation with Gases de Occidente
Requesting natural gas installation with Gases de Occidente is a key step to ensuring a safe, constant and affordable supply in your home or business.
This procedure is not limited to connecting the network: it involves meeting a series of technical and administrative requirements that ensure the installation complies with current safety regulations.
Understanding each stage of the process from the start will help you avoid delays and ensure that the connection is carried out without setbacks.
📋 Prerequisites for installation
Before starting the procedure, it is essential to confirm that your property has service coverage and meets the conditions required for a safe connection.
Gases de Occidente requests certain documents and information that will be used to verify the feasibility of the project.
The most important include:
- Applicant’s identity document, such as a cédula, cédula de extranjería or NIT if the applicant is a company.
- Exact address of the property, along with landmarks that make it easier to locate.
- Property title certificate or lease agreement, to prove ownership or right of use.
- Plans or sketches if the request is for new construction or remodeling.
Having this documentation ready from the start speeds up the review of the request and allows the technical visit to be scheduled more quickly.
Failing to prepare these items in advance can cause unnecessary delays.
🌐 Online application through the virtual office
One of the most convenient ways to complete the procedure is through the virtual office, which is available 24/7 and allows you to file the request without having to travel.
On this portal, the process includes registering or logging in as a user, selecting the type of service you need, and uploading the required documentation.
On the platform, you will need to complete these steps:
- Register or log in with your username and password.
- Select the option “New installation” or “Internal network extension.”
- Attach the documents in digital format for review.
- Confirm your contact details to coordinate the technical visit.
The system will generate a filing number that you can use to track the progress of your request.
You can access the platform at: https://www.gdo.com.co/oficina-virtual
This method is ideal for those who want a quick procedure with online tracking.
📞 Application by phone
For those who prefer personalized assistance or have specific questions about the process, applying by phone is an excellent option.
By calling the customer service line, you can receive guidance on the requirements, check coverage in your area and, in some cases, schedule the technical visit during the same call.
During the conversation, the advisor will ask you for key information such as:
- Identity document of the applicant.
- Full address of the property.
- Details about the type of installation required.
Having this information ready speeds up the service and avoids follow-up calls to complete missing details.
The official contact numbers can be found at: https://www.gdo.com.co/contacto.
🏢 In-Person Request at Service Points
If you need to submit physical documents, clarify complex questions or prefer direct contact, you can visit an in-person service point.
There you can file the application with the help of an advisor, submit the documentation and receive guidance on the design and technical requirements of the internal network.
During your visit, staff can:
- Verify the documents submitted.
- Confirm the technical feasibility of the service.
- Advise you on the estimated timeframes and costs.
Before going, check addresses and hours at: https://www.gdo.com.co/puntos-de-atencion to avoid unnecessary trips.
🔍 Technical assessment and quote
Once the application is filed, a technical visit to the property will be carried out. This step is essential to determine whether the installation is feasible and to plan the work safely.
The technician will assess aspects such as the route of the pipework, the location of the meter and the conditions of the space.
After this review, the company will prepare a detailed quote that includes the service costs and, in some cases, financing options.
Accepting this quote is an essential requirement before moving on to execution.
🛠️ Installation work
Once the quote is accepted, the installation will be scheduled and carried out by personnel authorized by Gases de Occidente.
This work includes installing the pipework, fitting the meter and carrying out leak-tightness tests.
The goal is to ensure that the entire network meets technical and safety standards before it is enabled.
Upon completion, you will receive a certificate of conformity and basic instructions for the safe use of the service.
❓ Frequently asked questions
1. How long does the installation process take?
The time may vary depending on technical availability and the complexity of the work, but it is generally completed within a few days after accepting the quote. If the installation requires special permits or additional work, the timeframe may be extended.
2. Can I finance the cost of the installation?
In some cases, yes. Gases de Occidente offers financing options that depend on credit evaluation and current policies. It is advisable to ask about these alternatives when you receive the quote.
3. Is it mandatory to contract the installation with Gases de Occidente?
The connection to the network and the installation of the meter must be carried out by Gases de Occidente or by personnel authorized by the company. The internal network may be installed by a certified contractor, but it must always comply with the required technical standards.
4. What should I do if there is no natural gas coverage in my area?
You can request a technical feasibility study through the virtual office (https://www.gdo.com.co/oficina-virtual) or sign up on interest lists for future service expansions.
5. How much does the installation cost?
The price depends on factors such as the distance to the main network, the complexity of the installation and the materials used. The official quote is provided after the technical assessment.